How we work
Six steps, one team and one contract.
- 01
Requirements
We meet to understand your operation, schedule and budget.
- 02
Site and feasibility
We assess your site or help you find one that works.
- 03
Design and budget
We develop the design and agree scope, price and schedule.
- 04
Permits
We obtain the municipal permits and other approvals.
- 05
Construction
We build, with progress reports and site visits.
- 06
Handover and after-sales
We hand over the building ready for operation and remain available.
On site
A building goes up in seven stages. Each one is checked before the next begins.
01
Site set-up and preliminary works
Before any earth is moved, the site is organised: hoarding, site office, temporary services and setting out the building on the plot.
- Hoarding and site sign
- Site office and temporary services
- Site clearance
- Setting out and levels
02
Earthworks and foundations
We excavate to design level and build the foundations specified by the soil survey.
- Excavation and underpinning
- Piles or pad footings
- Pile caps and ground beams
- Basements and waterproofing
03
Concrete structure
Columns, beams and slabs, floor by floor. Every pour is released only once the reinforcement is checked and the concrete tested.
- Formwork and reinforcement
- Slab pours
- Test cylinders and strength control
- Stairs and water tanks
04
Masonry and envelope
With the structure standing, the facades are closed and the interior partitions go up.
- Exterior and interior masonry
- Plastering
- Roof waterproofing
- Screeds
05
Building services
Water, drainage, power, air conditioning, fire protection and lifts: installed in coordination and tested before anything is closed up.
- Plumbing and stormwater
- Electrical and low-voltage
- Air conditioning and ventilation
- Fire protection and lifts
06
Finishes
What the user sees and touches: floors, wall finishes, paint, windows and doors, and fitted equipment.
- Floors and wall finishes
- Ceilings and paint
- Windows, doors, glazing and railings
- Joinery, fixtures and fittings
07
Final details and handover
We walk every room with a snag list, test the services and hand over the building with its documentation.
- Snag list and touch-ups
- Testing and commissioning
- Final cleaning
- As-built drawings, manuals and warranties
The stages of a build, explained by Mathias Benítez, civil engineer (in Spanish)
Watch on InstagramA project run in one system
The whole project is run in a single integrated system, from the budget to the accounts. That way you always know how much has been invested, what is left and when the work will finish.
- Quantity take-off and budgeting
- Cost control
- Procurement and contracting
- Site management
- Administration, finance and accounting
- Design in CAD and Revit